FAILURE INCIDENT REPORT — MP-22
Facility: High-Pressure Petrology Lab — Cell 4
Experiment Lead: —
Event Type: Catastrophic Structural Loss
Sample ID: MP-22
Secondary Classification: Cognitive–Affective Parallels (Unintended)
00:00 — System Baseline
- Chamber sealed.
- Pressure stable.
- Internal sensors responsive.
- Operator notes “no anomalies” (voice even, uncoloured).
(Parallel: Subject baseline—coherent self-report, intact routines, adequate function.)
04:52 — Early Deviation
- Minor pressure fluctuations (+0.2 GPa drift).
- Not yet outside operational tolerance.
- Sample integrity intact.
- Operator records “slight instability — continue.”
(Parallel: Early cognitive slip — small lapses, unnoticed by external observers.
Interpretation: “manageable.”)
10:31 — Escalating Stress Accumulation
- Rapid garnet expansion in core.
- Microfractures proliferating along former foliation.
- Instrumentation lag due to signal noise.
- Operator pauses, repeats note: “something’s shifting underneath everything.” EVERYTHING!
(Parallel: Internal strain compounding—structures “quietly giving way”. Losing losing
Subject reports nothing explicit; outward behaviour unchanged.)
14:44 — Containment Wall Resonance
- Chamber emits low-frequency resonance (78 Hz) associated with impending shear failure.
- Bolt strain gauges climbing sharply.
- Alloy frame exhibiting plastic deformation.
(Parallel: Psychological resonance—persistent internal pressure, rising without trigger, overwhelming coping structures.)
17:02 — Systemic Rupture Initiated
- Acoustic emission spike indicates brittle–ductile transition exceeded.
- MP-22 transitions into chaotic multi-phase breakdown.
- Melt fraction rises abruptly; uncontrolled exsolution.
- Operator: “I can’t tell what part failed first.” YOURHEADITSINYOURHEAD
(Parallel: Psychological overload—identity boundaries blur; intrusive thoughts, dissociation, internal heat with no outlet.)
17:05 — Catastrophic Chamber Breach
- Containment compromises along three axes.
- Release of high-pressure assemblage.
- Monitoring screens blank.
- Lab alarms sound, then fail. Quiet now
(Parallel: Collapse of internal structure—no continuity of narrative, no coheSÌon, no interpretive fraMework.)
17:07 — Aftermath Assessment
- Sample MP-22 unrecognisable.
- All minerals recrystallised or obliterated.
- No prior textures recoverable.
- No pathway to reconstruct original state.
- Operator sits, unresponsive, hands still on console.
(Parallel: Subject unable to articulate sequence—only the outcome: “I don’t recognise myself anymore.”)
Incident Summary
- Catastrophe occurred through accumulated invisible pressures rather than any single breach.
- Failure appears inevitable once threshold exceeded.
- No mechanism detected for reversal or repair.
- Records show the moment not when breaking occurred, but when resistance ceased.
Closing Remark (Automatic System Log)
“Identity loss irreversible.
Cause: sustained internal pressure.
Recommendation: none.”

Leave a reply to simonashcroft – poet & photos Cancel reply